国产高清在线观看-不卡无码av一区二区三区-天天爽夜夜爽精品视频婷婷-久久精品人人做人人爱爱-少妇在线视频-婷婷在线综合-亚洲大尺度av-一起射导航-一级毛片黄色-爽爽午夜影视窝窝看片-青青草色视频-国产色视频免费-国产福利在线 | 传媒-久久中文字幕人妻丝袜系列-自拍偷拍18p-超碰8-欧美自拍三级-国产私拍-国产精品久久久久久久免费软件-97人人模人人爽人人喊网

歡迎光臨,深圳市東勝達偉業科技有限公司官網!
Industry dynamics
當前位置:首頁 ? News ? Industry dynamics

How to lay the floor heating waterproof line?

時間:2021-12-06| 作者:Admin

Geothermal heating is one of the commonly used heating measures in northern households, which is very helpful for winter. It can be configured not only in living rooms and bedrooms, but also in kitchens and bathrooms. But waterproof and moisture-proof measures should be taken, otherwise it will have a significant impact on the service life of geothermal energy. So how to lay the floor heating waterproof line?

地暖防水線

1. Firstly, it is necessary to handle the floor heating laid on the ground, keep the ground clean, dry, and level, and then apply waterproof paint to prevent geothermal pipes from seeping into the downstairs. After the paint is dry, an insulation layer can be laid to prevent the waterproof film from generating odor when heated. Then lay geothermal pipes, lay a layer of composite film on the surface to isolate moisture, and finally lay the floor.
2. Precautions for floor heating construction.
① Pay attention to floor heating materials
Floor heating is a concealed project. Improper selection of underfloor heating materials, if there are quality issues or short service life, will affect the use and cause huge losses. Therefore, geothermal materials should be inspected before construction. The surface of high-quality floor heating pipes is smooth, without bumps, bubbles, or obvious color differences, and the hardness is moderate.
② Pay attention to on-site measurement
Before the construction of underfloor heating, it is necessary to find a professional installation company to analyze on-site measurements, as not every student's home or any functional area is suitable for installing underfloor heating. If installed in an inappropriate location, it is easy to encounter problems. Usually, a more reasonable design solution is needed.
③ Pay attention to the coil
Strict care must be taken during construction. The coil should pay attention to the distribution spacing, and the corners should not be bent to ensure the uniformity and stability of heat dissipation. During the construction process, the airtightness of the system should be checked at any time, and the water injection pressure test should not be ignored.

在線客服

微信公眾號
服務熱線:138-2529-3326